Interior Designers in HITEC City.
Office fit-outs in HITEC City, planned backwards from your move-in date.
An office floor in HITEC City, handed over on time
“Handled our office fit-out end-to-end. Fair pricing and on-time handover. Would engage them again for our next floor.”
A single-floor fit-out taken end to end — test fit, design, landlord approvals, build and handover — by one team on one programme. There are no photographs on this page: office interiors are published only with the client's consent, and this floor's are not.
What we find in HITEC City.
Our HITEC City reference is an office client whose floor we fitted out end to end and handed over on time — and who told us they would engage us again for their next floor. In a leased building that second sentence is the one that matters: the first fit-out is a test, and the next floor is the result.
The office stock here — the towers around Cyber Towers and Mindspace and along the Madhapur–Gachibowli spine — mostly leases as warm shell: the landlord's HVAC, fire systems and core services in place, an empty floorplate otherwise. The job is to plan around those systems intelligently and build fast, because rent starts before the desks arrive.
- 01
Warm-shell floors in IT parks
Landlord HVAC, sprinklers, fire detection and core lifts in place; sometimes a raised floor. We plan cabins, workstations, meeting rooms and the pantry around the existing grid and get the services drawings approved by building management before site start, so the fit-out itself is not waiting on paperwork.
- 02
Smaller offices and co-working units
Single units of a few thousand square feet in the mixed-use buildings around Madhapur and Kondapur, often occupied by the previous tenant until the week you take possession. Design, approvals and procurement run beforehand; site work starts the day you get the keys.
- 03
Street-level showrooms, clinics and cafés
Ground-floor units on the main roads, with signage, fire NOC and an opening date that is already printed on the invitations. Commercial interior scope: the brand translated into space, material and light, and a programme planned backwards from the date.
How long it takes in HITEC City.
- Single floor
- Test fit and design in three to four weeks. Fit-out of a typical warm-shell floor in six to ten weeks depending on area and cabin count, with the move-in date agreed in writing.
- Approvals
- Building management fit-out permissions and the fire NOC add lead time that sits outside our control. We apply during design, not after it, so they are back before site start.
- Occupied buildings
- Where the tower allows it, noisy work is scheduled after hours and phased by zone so neighbouring tenants and your own staff keep working.
A project in HITEC City starts like this.
Send the building name, the floor area and the lease start date on WhatsApp. The first meeting is on the floor itself with the landlord's drawings in hand, so the test fit starts from what is actually there.
Asked about HITEC City.
- Our lease starts on a fixed date. Can you hit it?
- Tell us the date first. We plan backwards from it, put the milestones in the contract and report against them every week. The HITEC City floor on this page was handed over on time.
- Can you start while the previous tenant is still on the floor?
- Not on the floor itself, but everything before site work — test fit, design, approvals, procurement — runs while they are, so the build starts the day you take possession rather than the day you start thinking about it.
- Who deals with building management and the IT vendor?
- We do. Services drawings, fit-out permissions, worker passes, work-hour windows and the network cut-over date are coordinated by the designer running your project, not handed to you.
Planning a project in HITEC City?
Send the building name, the floor area and the lease start date on WhatsApp. The first meeting is on the floor itself with the landlord's drawings in hand, so the test fit starts from what is actually there.
We reply within one working day. Studio visits are by appointment.